We've been traveling and visiting with my parents (posts to come soon) so this is a bit overdue, but our training space in Lawmbogo is just about complete.
At this point the walls are up, the ring beam is poured and most of the trusses are built and stacked on top of the walls.
The trusses are set and just about ready for sheeting.
At this point I'm missing pictures of a few steps for some unknown reason... Its a good things she's so sweet. I can't be mad at her for long!
Now the roof is finished and facia is on. Also, doors and windows are installed and plastering has begun.
The walls are built up above the roofing. The like to do it this way and it matches the existing buildings. Plastering is also well underway.
Plastering is nearly finished and "scaffolding" will come down soon.
Finishing details. The front walkway and water run-off control, clean-up, and painting.
We also set another 10,000 gallon rain water tank. This brings our total water catchment capability up to about 40,000 gallons or so. Gutters to be installed after painting is complete.
So right now we are finishing interior details like electrical, doors, and painting. Lord willing, we should be complete by the end of this week!
No comments:
Post a Comment